Wireless Networking at UT

Home

Overview

Get connected

Visitors

Coverage

Policies

Security

Support

Links/Reference

Contact

OIT

Buildings in Phase 2 of the Wireless Project

Phase 2 of the wireless project has been scaled down. It does not include dormitories and sports facilites. Below is the list of buildings completed in the phase 2. On-hold buildings from the phase 1 are still pending rewiring/network access.

Phase 2 buildings:

Center for International Education
Hesler Surge Building - White Ave.
Hesler Surge Building - Neyland Dr.
Honor Student Program (Melrose Hall)
Middlebrook Warehouse (offices only)
Minority Student Affairs(new)
Pellissippi A
Pellissippi B
Presidential Court (near OIT computer lab)
Stokley Athletic Center (few classrooms only)
UT Police Department
916 22nd Street
1819 Andy Holt
2000 Lake Ave
905 Mountcastle
907 Mountcastle
909 Mountcastle
2008 Terrace Ave
2019 Terrace Ave
2101 Terrace Ave
2110 Terrace Ave
2111 Terrace Ave
2124 Terrace Ave

Office of Information Technology