Wireless-Upgrade
New Wireless Networks at UTK are Live!
Phase one of the new wireless upgrade to 802.11n is complete and will officially go live Monday, July 20th. As a result of the upgrade, UTK will have a more secure, reliable, and available network for its users. As a part of the upgrade, the names of the wireless networks, known as the SSID's, will change, and the names will now be broadcast so users will no longer have to perform the extra step of configuring the network name. The former network name, nomad, will remain live for a period of time while users transition to the new network. However, we encourage everyone to join the new and improved network.
Wireless Upgrade from July 13 through July 17
Network Services will be upgrading the wired infrastructure to support the wireless upgrade in the following buildings outside of standard business hours on the following dates:
7/15 – Neyland Drive Biology Annex, Dabney-Beuhler
Presentation: UT's New Wireless Network
Philippe Hanset's presentation to UTK's LAN Managers is now available for public viewing. The presentation covers the major upgrade to wireless infrastructure to be completed by the end of the summer, and the changes users may encounter.
Wireless Upgrade from July 6 through July 10
Network Services will be upgrading the wired infrastructure to the following buildings outside of standard business hours on the following dates:
7/7 – Claxton Education, Claxton Addition (Bailey Ed. Complex)
Wireless Upgrade from June 29 through July 2
As OIT continues the upgrade of the wireless network to 802.11n, we will be replacing wireless access points in the following buildings during the week of 6/29/09. These dates are tentative and will be used as a guide for the technicians. As the access points in your building are replaced, you may experience intermittent wireless connectivity. The outages should last no longer that 10 minutes per access point.
6/29 - Plant Biotech, Johnson Animal Research & Training
6/30 - McCord Hall, Morgan Hall
7/1 - Thompson Boling Arena
Wireless Upgrade from June 22 through June 26
6/22 – Ellington Plant Science, Forestry Products, Forestry Building
6/23 – Plant Science Annex B, Biosystems Engineering, Biosystems Engineering Offices, Creamory Food Safety, Business Incubator
6/24 – Vet Med
6/25 - Vet Med
6/26 - Vet Med
Wireless Upgrade for the week of June 15 re-scheduled
The wireless upgrades, previously scheduled for June 15-19 have been re-scheduled for the week of June 22-26. Please refer to the newly updated schedule for details.
Wireless Upgrade from June 8 through June 12
6/8 – Tom Black Track Pressbox, Tyson Alumni Center, School of Pharmacy, Allan Jones Aquatic Center, Glazer Bldg, UT Welcome Center
6/9 – John D. Hodges Library
6/10 – John D. Hodges Library
6/11 - John D. Hodges Library
6/12 - John D. Hodges Library
In addition to the wireless upgrade we will be upgrading the wired infrastructure to the following buildings outside of standard business hours on the following dates:
Wireless Upgrade from June 1 through June 4
6/1 – SERF
6/2 – SERF
6/3 – Conference Center
6/4 – Tennis Facility, Architecture Research Annex, Ceramics Bldg., Child & Family Studies Research Annex, Office of Equity & Diversity, Presidential Court, Student Success Center, Temple Court, Transportation Services
Wireless Upgrade from May 25 through May 29
5/25 – Admin. Closing – Memorial Day
5/26 – Middlebrook Bldg., Burlington Bldg., Henson Hall
5/27 – Aconda Court, Andy Holt Tower
5/28 – McLung Tower, Stokely Management Center
5/29 – Student Counseling Center, Environmental Health & Safety (2111 Terrace Ave.), Music Annex (2016 Lake), TANDEC, White Ave. Biology Annex, White Ave. Building.
